← Back to Statement Engine

How to validate a forecast before export

Last updated: 2026-06-28

This guide focuses on users searching for practical steps like “how to validate forecast before export” or “forecast validation checklist.”

1) Run a pre-check sequence immediately

  1. Check opening BS date and forecast start alignment.
  2. Verify period settings (monthly/annual) and growth/lag parameters.
  3. Open the Checks tab and confirm major warnings first.
  4. Run one small scenario and compare only direction (up/down), not exact matching first.

2) Typical mismatch checkpoints

3) Pre-export checklist

4) How to report if still mismatched

If the mismatch remains after these checks, use how to verify forecast results and report issues and report:

Related pages